60 ft 2011 Hatteras 60 Motor Yacht, Change Order

60 ft 2011 Hatteras 60 Motor Yacht, Change Order
$1,399,000 (USD)
Description
Are you looking for a motor yacht that combines elegance ,performance, and comfort? Let me present to you "Change Order" a 2011 60 Hatteras motor yacht. This stunning vessel offers a truly exceptional cruising experience, perfect for those seeking the ultimate in style and relaxation on the water. The 60 Hatteras " Change Order" boats a sleek and timeless design that turns heads wherever it goes. Its spacious and well-appointed interior is crafted with high end materials and attention to detail. Step inside and you will find a welcoming salon with plush seating, a fully equipped galley and luxurious accommodations for you and your guests, The climate controlled flybridge offers panoramic views and is an ideal spot for entertaining or simply enjoying the journey. Equipped with ample seating , a refrigerator and grill makes for the perfect atmosphere for unforgettable gatherings with family and friends. The " Change Order " has had only three caring owners since new, having spent a lot of its life in the Great Lakes. Don't miss the opportunity to own this remarkable yacht that combines performance, elegance, and comfort. Contact us today to arrange a viewing.
Salon
In true Hatteras fashion, this passage-maker is not only practical but also customizable, with several different design options inside and out. The standard lower deck arrangement features a three-stateroom, two-head layout that places a full-beam master suite amidships, a VIP berth forward, and guest bunks to port.
Premium carpeting throughout full canvas runner set
Sharp Aquious 40" flat screen TV
Bose Life style surround sound system
High gloss teak coffee table with compass rose inlay
(2) Blue barrel swivel chairs
Large leather sofa with storage beneath
Ocean Air mini blinds
Large stainless steel trimmed salon entry sliding glass door
Abundant storage throughout
Galley
A single step up from the salon leads to the U shape galley with a country kitchen a large circular dinette which is found to port
Large L shape granite counter tops throughout
Dark laminate flooring throughout
Island style galley with stainless steel recessed sink Grohe satin finished spigot, storage and pull out trash can Miele 4 burner glass cooktop
Miele stainless steel oven
Miele Optima series dishwasher with matching cabinet face
Jenn-Air stainless steel microwave convection oven
Jenn-Air drawer style undercounter refrigeration (2) refrigerators (2) freezers
U-Line clear ice maker
U-Line stainless steel wine chiller
Large L shape circular dinette with large granite counter top
Laundry
Located downstairs from the galley features abundant cabinet storage and a small pantry Whirlpool stackable washer dryer combo is located in the hallway
3
Guest Stateroom
Located to the Port side is the guest stateroom featuring over/under berths for two Cedar lined hanging closet
Carpeted sole throughout
Storage and book shelves
Sharp 15" flat screen TV
Clarion CMV-1 DVD/CD player
VIP Stateroom
Located all the way forward is the VIP stateroom
Large center lined Queen size berth with abundant storage beneath
Large overhead deck hatch with sun shade
Large cedar lined hanging closet
Sharp 15 ' flat screen TV
Clarion CMV-1 DVD/CD player
Polk Audio overhead speakers
A/C controls
Abundant storage throughout
Guest head ensuite access
VIP Guest Head
Located downstairs to Starboard lies the guest head with hall way and VIP ensuite access Large mirrored medicine cabinet
Corian countertop with white Kohler undermounted sink
High gloss fixtures throughout
Large walk in shower stall featuring curved acrylic door
Fresh water marine head
Exhaust fan
Dark laminate flooring
4
Master Stateroom
Located all the way Aft is the expansive full beam master stateroom with center lined King size berth and dual hull side windows provide excellent lighting
Full King size master berth with storage beneath
Dual cedar lined his and hers hanging closets
Sharp Aquios 40" flat screen TV
Bose surround sound system
Large 6 drawer dresser to Starboard
Make up desk/vanity with padded stool
Ocean Air blinds
Large 6 drawer dresser to Port
A/C controls
Master Head
The Master stateroom head features a large counter space as well as a full walk in shower stall with abundant storage throughout
Polished marble counter tops
Round White Kohler surface mounted sink
Custom tiled backsplash
Large walk in shower with teak sub floor and glass sliding doors
Large mirrored medicine cabinet
Mirrored ceiling
Exhaust fan
Fresh water marine head
Dark laminate flooring throughout
Flybridge
The fully climate controlled Flybridge offers amazing views and an additional level of entertaining with an open Aft deck featuring an Electric grill and refrigerator
Center lined helm with modified A/C ducts for better air flow
Dual Pompanette Platinum Series helm chairs with cloth covers
L shape seating Aft with storage below
Large white fiberglass table
Indoor/outdoor carpeting inside helm deck
Full enclosure throughout flybridge
Gaggenau stainless steel grill with custom cabinet
U-Line refrigerator
Steel Head WD1000 davit
5
Electronics
(2) Raymarine Axiom 12RV MFD displays
Simrad AP-24 autopilot
Furuno RD-30 depth repeater
Flir camera
ACR spotlight
Icom IC-M604 VHF
Fusion marine stereo Fusion Coax speakers
CAT digital engine dispalys
ZF controls with optional joystick
ZF emergency back up controls
American Bow Thrusters hydraulic bow thruster
Yacht Controller
Hatteras information center
Engine Room
Located beneath the Aft deck is the large access hatch to the engine room which can also be entered through the transom bustle door
(2) Caterpillar C-18 ACERTS 1075 hours
(2) Onan 21.5 KW marine gen sets PT 931 hours STB 872 hours
Chargemaster 24/60-3 marine battery charger
Pronautic 24-20P marine battery charger
American Bow Thruster hydraulic bow thruster
Aquamiser Plus AM 826S water maker
Sea -Fire FM-200 fire Suppression System
Headhunter Mach 5 fresh water pump
Delta -T engine ventilation system
Dual Glenn-denning shore cord retractors
Large Lazzerette storage all the way aft with transom bustle door
Exclusions
All the owners personal affects, tools, and spare gear not pertaining to the boat the tender is not available at this point in time
Disclaimer
The Company offers the details of this vessel in good faith but cannot guarantee or warrant the accuracy of this information nor warrant the condition of the vessel. A buyer should instruct his agents, or his surveyors, to investigate such details as the buyer desires validated. This vessel is offered subject to prior sale, price change, or withdrawal without notice.
Specifications
| Manufacturer | Hatteras |
| Model | 60 Motor Yacht |
| Year | 2011 |
| Condition | Used |
| Hull Material | Fiberglass |
| Length | 60 ft 11 in |
| Beam | 18 ft 2 in |
| Max Draft | 4 ft 6 in |
| Fuel Type | Diesel |
| Name | Change Order |
| Engine #1 Type | Inboard |
| Engine #1 Model | 2011 Caterpillar C-18 ACERT |
| Engine #1 Fuel | Diesel |
| Engine #1 Power | 1135 hp |
| Engine #1 Hours | 1075 |
| Engine #2 Model | Inboard |
| Engine #2 Fuel | Diesel |
| Engine #2 Power | 1135 hp |
| Engine #2 Hours | 1075 |
| LOA | 60 ft |
| LWL | 53 ft 1 in |
| Dry Weight | 94,000 lb |
| Fuel | 1 x 1,000 gal |
| Fresh Water | 250 gal |
| Guest Cabins | 3 |
| Guest Heads | 2 |
| Hull Shape | Semi Displacement |
| Drive Type | Direct Drive |
| Warranty | 5 years |
